I'm so happy today (^-^). After few days struggling with pumping sludge to the system, I can handle the system well this morning. Last few days and even today early morning, I was having "fun" (T.T) with cleaning the mess when the sludge split over the floor. I was so used to deal with that kind of mess when I was at USF but still, I felt so embarrassed here whenever the sludge was all over the floor. Anyway, everything is under control now :) hopefully, after temperature control added (this afternoon), the system will be good to run the gypsum leachate. Finger crossed :)
Anh
Tuesday, May 31, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment